-
-
Sponsor Video: Overture 6500 Service Delivery Platform
-
Subscribe to Newsletter
Enter your e-mail address to receive the top headlines.
-
Authors
-
Level 3 Claims Unique Backhaul Strategy
Light Reading (Apr 28 2011) Mobile Backhaul , Heavy Reading
-
"Wireless operators generally buy Ethernet interfaces from us at speeds of 100 Mbit/s or 50 Mbit/s up to 1 Gbit/s," Savill says.
Level 3 is building microwave towers at the site and, at the foot of the tower, adding an environmentally controlled hut for wireless operators' microwave equipment. The smaller structure is connected to the regen/amplification hut by buried cable that connects to a cross-connect panel within the larger hut.
(Read Full Article)
Login to comment
Related Articles
- EarthLink Back in the Game, Buys ITC
- also written by Carol Wilson
- Mobile Strategy Upheaval Calls for Policy Management
- also mentions AT&T Inc.
- Carrier Ethernet Gets Off the Island
- also mentions IBM
- CENX Opens Carrier Ethernet Voice Exchange
- also categorized in Mobile Backhaul
- Qwest Reshapes Wireless Backhaul
- also written by Carol Wilson
- Ethernet Exchanges Attracting Mostly Sellers
- also written by Carol Wilson
- Carrier Ethernet Global Interconnect Service Provider Interoperability Test
- also categorized in Mobile Backhaul
- Enterprise Ireland Showcases Innovative Technology for US Market at Ctia ...
- also categorized in Mobile Backhaul
- Stimulating carrier Ethernet sales
- also categorized in Mobile Backhaul
- Overture Networks Boosts UTS4000 and UTX8500 Platforms with 1588v2 ...
- also categorized in Mobile Backhaul
-

Recent Comments
laurabicom » CLECs to ILECs: Don't hang up your copper networks!
Good article, thanks for posting. We also have an article on CLEC: http://blog.bicomsystems.com/clec
asadnaveed » Guest Commentary: Carrier Ethernet APAC Conference
I also had the honor to participate in the Conference. I spoke on the topic ...
See all recent comments